LEAKEY WEATHER

Previous Canyon Alerts

October 23, 2018 — As of 4:00 p.m., RIVER ROAD HAS REOPENED. The waters have receded, and we continue to watch conditions closely. All Canyon guests and operations staff are safe and secure.

October 22, 2018 — As of 8:00 p.m., River Road is closed to traffic in anticipation of possible flash flooding.

October 16, 2018 — As of 2:15 p.m., RIVER ROAD HAS REOPENED. The waters have receded, and we continue to watch conditions closely. All Canyon guests and operations staff are safe and secure.

October 16, 2018 — As of 7:00 a.m., River Road is closed to traffic. The Blue Hole monitoring system reads 16.4 feet, about 3 feet above normal. The Frio Canyon has received about 2.3 inches of rain in the last 24 hours, and we continue to watch conditions closely. All Canyon guests and operations staff are safe and secure.

October 15, 2018 — The rise at the Blue Hole monitoring system read 15.4 feet, about 2.5 feet above normal. River Road had been closed at 5:00 p.m. in anticipation of this rise.

October 9, 2018 — River Road reopened to traffic at 8:00 p.m. All Canyon guests and operations staff are safe and secure. Please continue to pray for the people in Junction who have been hit the hardest.

October 8, 2018 — River Road was closed due to flooding. All Canyon guests and operations staff were safe and secure. Flood waters at Blue Hole peaked at seven feet above our flood gauge. H. E. Butt Foundation staff were able to warn their neighbors downstream of the ten foot wall of water heading their way. Camp Director John Kerr stayed in conversation with all affected groups. Please pray for the people in Junction who have been hit the hardest.

August 26, 2017 — Tropical Storm Harvey had minimal impact in Real County. Please join us in praying for our neighbors on the Texas coast.